1 / 3
SH1 Road Upgrade Auckland
During the SH1 road upgrade in February 2020 the first ACO Monoblock trench channel drain was successfully installed. In collaboration with ASM Auckland System Management and the local contractor TWC, ACO supplied a heavy duty drainage solution that fulfilled the requirements of the highly trafficked highway. With its high capacity, ACO’s Monoblock RD200V 20.0 minimised the risk of standing water on the road and due to the monolithic characteristic, there was no risk of flying components as well. Overall the product was chosen for its durability and ease of maintenance access.
Find out more about the product here.